•  Providing ladder mounted Diesel vehicle with Driver for three shift for Mandi Samity S/S under newly constructed Hanspuram Division of the area of E.U.D.C.-III, KESCo. Kanpur.
  •  Disconnection of Defaulter consumers on basis of RC/DC and realization various division under the area of E.U.D.C.-III, KESCo. Kanpur.
  •  Disconnection of Defaulter Consumers on the basis of RC/DC and Realisation under Circle-I, KESCo.
  •  To Release of 70 KW HT BULK Connection to UHM Hospital, Parade, Kanpur under Electricity House Div.
  •  Work for providing electricity connection free of charges under Pradhan mantri sahaj bijli har ghar yojna "Saubhagya" including material such as switch, socket, plastic holder, switch board, PVC pipe, service cable, GI wire, MS angle, LED Bulb (9 watt) among EUDD Kidwai nagar, Jajmau, Harissganj, Naubasta, Daheli Sujanpur, Hanspuram under EUDC-III, Kidwai Nagar, KESCo, Kanpur
  •  To Give the new electricity connection to the poor consumers under the scheme of SAUBHAGYA YOJNA under Circle-1 concerning Division(s) (AL,EH,NG,PB,ZC)
  •  For Repairing & Maintenance of 11 KV/6.6 KV Relay of Breakers & Battery Charger installed at different sub-stations of 33/11 KV and 33/6.6 KV are to be carried out under the area of E.U.D.C.-I, KESCo. Kanpur.
  •  Installation of LPR Meter on Pole on those consumers having load 10 KW & Above under E.U.D.C.-III, KESCo. Kanpur.
  •  Installation of Prodigy Meter on Pole on those consumers having load between 25 to 49 KVA under E.U.D.C.-III, KESCo. Kanpur.
  •  Work under maintenance, system improvement & deposit scheme of 11/6.6/0.4 KV O.H. /U.G. line and breakdown work of 11/0.4 or 6.6/0.4 KV LT Lines, Pole replacement, Construction / Strengthening, re-arrangements including loading, unloading and carriage work of Distribution Division Jajmau, Kidwai Nagar, Harrisganj, Naubasta & Daheli Sujanpur under E.U.D.C.-III, Kidwai Nagar, KESCo. Kanpur.
  •  Installation of 100 KVA T/F and Construction of H.T. & L.T. Line (A B Cable) at Durga Nagar, KDA Colony, Arra Bingawa under E.U.D.D. Naubasta, KESCo. Kanpur
  •  Shifting of 1 Phase & 3 Phase Meter from inside the house to outside house. Replacement of mechanical, semi-electronic & defective single/three phase energy meters by new electronic energy meters. UNDER EUDC-III, KESCO. KANPUR
  •  Laying of A B Cable and Erection of S.T. Pole at S & O Block Yashoda Nagar under E.U.D.D.Daheli Sujanpur and replacement of conductor to A B Cable at Old Namak Factory Chauraha under E.U.D.D. Naubasta, KESCo. Kanpur
  •  Replacement of meter from inside house to outside & Replace defective semi and electronic meters etc. under Circle-I/Divisions.
  •  Installation of 63 KVA T/F at M-Block Park, Near Nagarik Dharamshala, Kidwai Nagar under EUDD Kidwai Nagar & Laying of A B Cable and Erection of S.T. Pole at Khaleel Quarter near Cantt area under E.U.D.D. Harrisganj, KESCo. Kanpur
  •  Demolition of old Store at Dalmandi store building and boundary wall at back of division office at Phoolbagh Kesco Kanpur
  •   Maintenance work of distribution transformers and rectification of defects found there upon under the area of E.U.D.D. Jajmau, Harrisganj, Naubasta, Kidwai Nagar & Daheli Sujanpur KESCo. Kanpur
  •  Work under maintenance, system improvement & deposit scheme of 11/6.6/0.4 KV O.H. /U.G. line and breakdown work of 11/0.4 or 6.6/0.4 KV LT Lines, Pole replacement, Construction / Strengthening, re-arrangements including loading, unloading and carriage work of Distribution Division Jajmau, Kidwai Nagar, Harrisganj, Naubasta & Daheli Sujanpur under E.U.D.C.-III, Kidwai Nagar, KESCo. Kanpur.
  •  General checking of switch gears and attend the VCBs breakdown, maintenance including overhauling of Different make VCB’s and rectification of defects found their upon under jurisdiction of E.U.D.C.-III, KESCo Kanpur
  •  Laying of A B Cable & 27 No. PCC Pole at Adarsh Vihar & LIC Park C Block Shyam Nagar under E.U.D.D. Daheli Sujanpur, KESCo. Kanpur
  •  Maintenance of Computer, UPS & Printer installed under the area of EUDC-III KESCo. Kanpur
  •  PROVIDING AND FIXING MODULAR OFFICE CUBICAL PARTITION IN CALL CENTRE AT KESA HOUSE, KANPUR.
  •  Cutting of Tree Branches, which are touching the H.T./L.T. electric lines and due to which electrical accident may occur under the area of E.U.D.C.-III, KESCo, Kanpur.
  •  Deployment of Generator Set (7.5 KVA Capacity) with Operator on hire basis in Jajmau, Kidwai Nagar, Naubasta & Daheli Sujanpur Division under EUDC-III, KESCo. Kanpur
  •  For the Work from CSA to KDA Premises at the time of visit program of honble Governor and other VIP under Nawabganj Division.
  •  For the Work Damage ABC & Jarjar Pole on the occassion of RAMJAN under Zareebchowki.
  •  Installation of New 63 KVA T/F at 171- N Block, Kidwai Nagar under E.U.D.D.Kidwai Nagar, KESCo. Kanpur
  •  Testing of equipment & routine & emergency testing work of Breakers/Pannels various 33/11 KV & 33/6.6 KV S/s under the area of Circle-I, KESCo.
  •  Installation of New 63 KVA T/F at Araji No. 176 & 178, Sainik Nagar, under E.U.D.D. Harrisganj, KESCo. Kanpur
  •  Treeming of tree branches in the area of Nawabganj & Zareebchowki Division.
  •  For giving H.T. Bulk Connection to the Project Manager, Jal Nigam C/o Sri Syed Mazahir Zia Rizvi, Aasara Awasiya Yojana near and College Brahm Nagar ar ZC Division under full Deposit Scheme.
  •  Attending of Break Downs, Repairing of damage poles & lines at the time of Storms.
  •  For Shifting of Nagar Nigam H.T. Metering Cubical from Shiva ji gate to Nagar Nigam S/s to making of 445 Mtr. 11 Kv O.H. H.T. Line emanating from 11 KV Gangotri Feeder under Nawabganj Division.
  •  For giving connection to Project Manager (Vidhut/Yantrik) U.P. Jal Nigam, Achhuta Nand Park, Chammanganj, Kanpur under Zareebchowki Division.
  •  For loading and unloading of damage transformers with the help of Lodder/Bhaisa Thela at Electrcity House, Zareebchowki, Aaloomandi & Phoolbagh Division.
  •  For giving Connection to Dist. Probation Officer Kanpur City at Premises Rani Laxmi Bai Asha Jyoti Kendra Sankramak Rog Campus Goal Chauraha Near Hallet Hospital under Nawabganj Division.
  •  For Shifting 250 KVA DT Transformer in front of premises 6/24-A Parwati Bagla Road Kanpur to the corner of the same premises. As per application of Smt. Sai Kiran Khanna in fully deposit scheme under Nawabganj Division.
  •  For Providing Double Metering of the consumers having load 10-24 KW under EUDC-I, KESCo.
  •  Shifting of 400x2 KVA Distribution T/f from district Court Compound to Outside Court Compound boundary wall side under Electricity House Division.
  •  For Laying of New A.B. Cable at 400 KVA T/F Chuna Bhatia G.T. Road Kanpur under Zareebchowki Division.
  •  For Annual Maintenance of Computer Systems installed & Printers in Circle-I Office & Division Office of Circle-I, KESCo.
  •  For Chemical Earthing for Power Transformers installed in CircleI S/s.
  •  For Chemical Earthing for Distribution Transformers under the Jurisdiction of CircleI.
  •  For Replacement and Repairing of old H.T. jarjar and Broken Poles in Jawahar Nagar SubDivision on Feeder No. Harsh Nagar, M54, Viveka Nand and 80 feet Road Feeder under Zareebchowki Division.
  •  For Replacement of L.T. Poles and Repairing of old jarjar and rusted Poles in Jawahar Nagar SubDivision in Feeder Harsh Nagar, M54, M108 and 80 Feet Road Feeder under Zareebchowki Division
  •  Overhauling & Maintenance of Different make 11/6.6 KV VCBs & OCBs at CircleI
  •  For increasing capacity from 100 KVA Himgiri T/F to 400 KVA T/F 6.6/0.42. With making T/F Plinth & Fencing due to Fault U/G Cable Under Rly. Track at near Anwerganj Railway Station Under EUDD-ZC KESCo, Kanpur.
  •  (1) For Laying of additional 150 mtr. H.T. XLPE U/G Cable 3x185 Sqmm From 33/11/6.6 KV Benajhabar SubStation to Jal Sansthan Gate on 6.6 KV 34/231 No. Feeder under EUDDNawabganj KESCo. (2)For Laying of additional 365 mtr. H.T. XLPE U/G Cable 3x185 Sqmm. From 33/11 KV B.S. Park SubStation to B.S. Park Gate on 11 KV Madical Feeder under EUDDNawabganj KESCo
  •  For Laying of New additional 3x300 Sqmm. XLPE U/G cable 33 KV at Various place on aloomandi 33 KV Feeder No.2 Side by Side of old PILCA Cable 3x240 Sqmm under Zarib Chowki KESCo.
  •  Installation of 63 KVA T/F at Araji No. 176 & 178, Sainik Nagar under EUDD Harrisganj, KESCo. Kanpur
  •  Demolition of Old control room building at Depti ka Padav chauraha and Parampurwa Kanpur for construction of new control room building at above locations and stacking of dismantled serviceable material and disposal of unserviceable material by all means up to dumping site to the best satisfaction of auctioneers.
  •  Construction of Type-III quarters & Field Hostel at Kesa Worker Colony, Azad Nagar for Junior Engineers & Field Hostel at Khalasi Line for kesco officers, Kanpur.
  •  For Chemical Earthing for Power Transformers installed in Circle-I S/s.
  •  For Chemical Earthing for Distribution Transformers under the Jurisdiction of Circle-I.
  •  For Replacement and Repairing of old H.T. jarjar and Broken Poles in Jawahar Nagar Sub-Division on Feeder No. Harsh Nagar, M-54, Viveka Nand and 80" Road Feeder under Zareebchowki Division.
  •  For Replacement of L.T. Poles and Repairing of old jarjar and rusted Poles in Jawahar Nagar Sub-Division in Feeder Harsh Nagar, M-54, M-108 and 80" Road Feeder under Zareebchowki Division.
  •  Overhauling & Maintenance of Different make 11/6.6 KV VCBs & OCBs at Circle-I
  •  For increasing capacity from 100 KVA Himgiri T/F to 400 KVA T/F 6.6/0.42. With making T/F Plinth & Fencing due to Fault U/G Cable Under Rly. Track at near Anwerganj Railway Station Under EUDD-ZC KESCo, Kanpur.
  •  (1) For Laying of additional 150 mtr. H.T. XLPE U/G Cable 3x185 Sqmm From 33/11/6.6 KV Benajhabar Sub-Station to Jal Sansthan Gate on 6.6 KV 34/231 No. Feeder under EUDD-Nawabganj KESCo. (2)For Laying of additional 365 mtr. H.T. XLPE U/G Cable 3x185 Sqmm. From 33/11 KV B.S. Park Sub-Station to B.S. Park Gate on 11 KV Madical Feeder under EUDD-Nawabganj KESCo.
  •  For Laying of New additional 3x300 Sqmm. XLPE U/G cable 33 KV at Various place on aloomandi 33 KV Feeder No.-2 Side by Side of old PILCA Cable 3x240 Sqmm under Zarib Chowki KESCo.
  •  Annual Maintenance of Computer, Printer & UPS installed under the area of EUDC-III, KESCo. Kanpur
  •  Construction of toilet in residence no. 8, Guard room in residence no. 01 at Vishnupuri & Guard room at Khalasi Line, kesco officers colony, Kanpur.
  •  Special m&r of residence no. 5 & 7 at Vishnupuri officer colony and residence no. 14 at Tilak Nagar officer colony kesco, Kanpur.
  •  Shifting of 400 KVA Distribution T/F infront of House No. 158 E-2 Khyora, Nawabganj to outside Khyora Village at the corner of Village street on Zoo Gurudeo Road as per request of Shri. Manoj Kumar S/s Baijnath House No. 158 E-2 Khyora Nawabganj, under Vikas Nagar Division, Kesco., Kanpur
  •  providing electrician & motorman-tubewell operator for maintenance of kesa house, kesco, Boring & installation of 1.5 h.p. Submersible motor at various 33-11 k.v. Sub-station officers colony of kesco, Operation of tubewells in kesa workers colony, azad nagar and Specail m&r of 33-11 k.v. sub-station factory area Fazalganj, kesco, Kanpur.
  •  For increasing Load H.T. Bulk Connection in the name of Broad Costing Engineering Consultant India Ltd. Benajhabar Akashwani, Kanpur Under Nawabganj Division.
  •  For giving 150 K.W. Temporary Connection to National Handloom Expo for 2016-17 (from 15.01.16 to 04.02.17) at brijendra Swaroop Park at Nawabganj Division.
  •  Sifting of Transformer at Swaroop Nagar, Kanpur under Nawabganj Division.
  •  Replacement of damaged/defective CT/PT Under the area of EUDC-III, KESCo. Kanpur
  •  Attending Breakdown, construction, re-arrangement, shifting, replacement/ repairing of damage poles etc. of lines and sub-stations apparatus against M&R, small S.I. & Deposit work of 33 KV and 11 KV O/H and U/G line and Sub-Stations including loading, unloading, carriage, dementalling and erection of power T/F, oil centrifusing (1.5 to 10 MVA) and all related work under EUDC-III, Kesco., Kanpur
  •  Attending Breakdown, construction, re-arrangement, shifting, replacement/ repairing of damage poles etc. of lines and sub-stations apparatus against M&R, small S.I. & Deposit work of 33 KV and 11 KV O/H and U/G line and Sub-Stations including loading, unloading, carriage, dementalling and erection of power T/F, oil centrifusing (1.5 to 10 MVA) and all related work under World Bank Barra & Govind Nagar Division EUDC-II, Kesco., Kanpur
  •  Attending Breakdown, construction, re-arrangement, shifting, replacement/ repairing of damage poles etc. of lines and sub-stations apparatus against M&R, small S.I. & Deposit work of 33 KV and 11 KV O/H and U/G line and Sub-Stations including loading, unloading, carriage, dementalling and erection of power T/F, oil centrifusing (1.5 to 10 MVA) and all related work under Ratanpur, Dada Nagar & Gumti Division EUDC-II, Kesco., Kanpur
  •  Laying of L.T. Aerial Bunched Cable near Ara Machine to 127-A Gopal Nagar, 48 Gopal Nagar to 26-D Gopal Nagar and 59 –A Gopal Nagar to B-35 Gopal Nagar under Daheli Sujanpur Division, Kesco., Kanpur
  •  Supply of office furniture in SE EUDC –III, KESCo. Kanpur
  •  M&R of water supply and sanitary fitting in kesa house, half yearly repair of 1.5 H.P. Submersible motor & pumps in officers, colony & 33-11 k.v. Various sub-station and half yearly m&r works of kesa house, KESCO, Kanpur.
  •  Structure designing of transformer repairing workshop and store shed, Kesco, Kanpur.
  •  Structure designing of transformer repairing workshop and store shed, Kesco, Kanpur.
  •  Special m&r of civil work of Guest House at Tilak Nnagar KESCo & Special m&r of residence no 1 Vishnupuri officer colony Director Finance & providing CC Approach road in residence no 8 Vishnupuri officer colony Director Technical KESCo Kanpur
  •  Installation of Double Meter(Pole Meter) on Consumers Having Load from 10 KW to 24 KW under E.E. (Test-I)
  •  For giving 80 KW H.T. Bulk connection to Sachiv Kanpur Vikas Pradhikaran, Ganesh Udyan Phoolbagh Garden, Kanpur.
  •  Shifting of existing electrical utilities (33KV, 11KV and 0.4KV lines and distribution T/F) due to widening of road from Companybagh Chauraha to Ganga Bairaj Chauraha under Nawabganj Division Kesco, Kanpur.
  •  Laying of 11 KV XLPE Cable from Double Pole Structure of 11 KV M.E.S. Feeder emanating from 33/11 KV Ring Road Sub-Station Near 33 KV Sub-Station M.E.S. Cantt area to Aerodrum to maintain Disturb Supply due to totally damaged PILCA Cable Office of Director Airport Authority), Civil Aviation, Aerodrum under EUDC-III, Kanpur.
  •  Structure Designing of transformer repairing workshop and store shed, Kesco, Kanpur.
  •  Repairing of bill collection center and meter outlet roof & m.s. work, drain cover at Bijlighar Kesco, Kanpur.
  •  Structure designing of Transformer repairing workshop and store shed, Kesco, Kanpur.
  •  Laying of 33 KV 3x300 Sq.mm XLPE Cable Parallel with 33 KV Old Single XLPE Cable Near Baba Nagar and Guarding of 33 KV Tatya Tope Nagar (Newly Naubasta-1, Baubasta-2), Feeder emanating from 220 KV Primary S/S Naubasta under Naubasta Division, Kesco., Kanpur
  •  Deployment of Generator Set with Operator on hire basis in the area of Zareeb Chowki, Aaloomandi, Phoolbagh & Electricity House Division.
  •  For Laying of U/G 2000 Mtr. XLPE able of O/H 33 KV Khas Bazar Feeder from Z-Square to Khas Bazar S/s and from Zquare to chhaper S/s at Phoolbagh Division.
  •  Replacement of damage ABC of Imam chowk T/f & Laying of New ABC with 6 Pole at Gummu Khan Hata at Electricity House.
  •  Special m&r of civil, electrical, sanitation works & construction of fire protection wall at 33/11 K.V. Sub-station Sarvodaya Nagar-II (RTO) Kesco, Kanpur.
  •  Replacement of Jarjar ACSR Mix Conductor by laying of Aerial Bunched Cable at Sindhi Colony, Shastri Nagar under Ratanpur Division, Kesco., Kanpur
  •  Making 33 KV Double Supply arrangement at 33/11 S/S G.I.C. by Constructing 33 KV O/H & U/G Line from BNSD Tiraha to 33/11 S/S G.I.C. and Shifting of Existing 11 KV Line and LT ABC on Newly Erected Line under Electricity House Division, Kesco., Kanpur
  •  Attending breakdowns, construction, re-arrangement, shifting, replacement/repairing of damaged poles etc. of lines & Sub-station apparatus against M&R, small S.I. and Deposit works of 33KV & 11KV O/H and U/G lines & Sub-station including loading, unloading, carriage, dismentalling & erection of power transformer, oil centrifusing (1.5 to 10 MVA) and all related works under E.U.D.C-IV, Kesco., Kanpur.
  •  Attending breakdowns, construction, re-arrangement, shifting, replacement/repairing of damaged poles etc. of lines & Sub-station apparatus against M&R, small S.I. and Deposit works of 33KV & 11KV O/H and U/G lines & Sub-station including loading, unloading, carriage, dismentalling & erection of power transformer, oil centrifusing (1.5 to 10 MVA) and all related works under E.U.D.C-I, Kesco., Kanpur.
  •  Shifting of existing electrical utilities (33 KV, 11 KV and 0.4 KV lines and distribution T/F) due to widening of road from Railway Crossing G.T. Road Kalyanpur to Bhatia Tiraha Panki Kalpi Road, under Kalyanpur & Ratanpur Division Kesco, Kanpur (Full Deposit Work) (Part-1: From Lali Transformer to Lodheshwar Mandir & Avas Vikas-III, Kalyanpur )
  •  Laying of A B Cable in different area under EUDD Daheli Sujanpur, Kanpur.
  •  For the work of Resagging of Conductor, Pole Plinth & Fencing at Palika Stadium under Nawabganj Division.
  •  For replacement of New ABC 3x120 Sqmm. in place of old & Damage 3x95 Sqmm. ABC at 400 KVA T/f Fire Station, Latouch Road at Aloomandi Division.
  •  Annual upkeeping of lawn and plants at residences of Director (T.), Director (C.) & Director (F.) at Vishnupuri officer colony, kesco and construction of guard room, toilet, at residence no. 8 and pvc tiles flooring in resedence no. 2 & 8 of vishnupuri kesco, kanpur
  •  Laying of ABC & LT Poles in Three Places at EH Division.
  •  Supply from Two Sources at Green Park Stadium durng Cricket Match for Double Pole TPMO, Fencing & Plinth.
  •  Installation and maintenance of 2MBPS internet Lease line at 5 centers of KESCo.
  •  Supply of Biometric Machine and Installation, Software for Salary preparation with one year AMC, Supply of Headphone with mike for attending calls & short/long code for SMS broadcasting and receiving
  •  Construction of store shed main gate ramp and other misc. works at r.p.h. petrol pump kesco, kanpur.
  •  Civil, sanitary & electrification works for modification, alteration & renovation of pension payment office to convert m. d., director and s. e. office their toilet and m. d., kitchen at kesa house, remaining civil works at 33-11 k.v. sub-station singhpur tiraha and alumunium partition and fall ceiling work for modification, alteration & renovation of pension payment office to convert m.d., director and s.e. office at kesa, kesco, kanpur.
  •  For laying of new 11 KV HT XLPE under ground cable 3x300 Sqmm. in place of old & damage PILLCA Cable 3x240 Sqmm at feeder No. 10 Tikoniya Park H.T.P.B. to Mazdoor Sabha Road 11 KV Double Pole at Makbara under EUDD-EH, KESCo.
  •  For General Checking & Attending of Leakage of distribution transformers installed at Electricity House Division.
  •  For arranging Electricity Supply System through Two Sources at Green Park Stadium.
  •  Date Extension of Tender No. 04/EUDC -III/2016-17
  •  Date Extension of Tender No. 03/EUDC -III/2016-17
  •  Installation of Distribution T/F & Laying of L.T. A.B.C. line at Narayanpuri under the area of E.U.D.D.-Naubasta, KESCo. Kanpur  Tender No 1.pdf,200517093.pdf
  •  Providing welded wire mesh and door uder of scrap yard shed to convert civil store at kesa house kesco AND construction of boundary wall of store and repairing of j.e. room shed fall ceiling control room and other room and other misc. works at naubasta division & sub-division office kesco kanpup.
  •  CONSTRUCTION OF TOILET & MICS CIVIL WORK AT SE OFFICE BUILDING 33 KV H BLOCK KIDWAI NAGAR KESCo AND M&R OF DOOR & WINDOW SHUTTER AT KESA WORKER COLONY AZAD NAGAR KANPUR
  •  M&R OF OFFICE ROOF AND OTHER MISC CIVIL AND SANITARY WORK AT WORLD BANK BARRA DIVISION OFFICE KESCo AND MODIFICATION & RENOVATION OF BULK OFFICE FOR DIRECTOR T OFFICE AT KESA HOUSE KESCo KANPUR
  •  M&R OF DOOR & WINDOW SHUTTER AT KESCO OFFICER COLONY VISHNUPURI TILAK NAGAR MALLVIEW KHALASI LINE MD HOUSE & GUEST HOUSE KESCo AND M&R OF ELECTRIFICATION WORK AT VARIOUS 33-11 KV SUB-STATION UNDER CIRCLE- I II III & IV KESCo KANPUR
  •  For laying of New additional 11 KV H.T. XLPE Under Ground Cable 3x120 Sqmm. from Ghariwali Masjid to Nazir 400 KVA T/f at Mohd. Ali Park under Zareebchowki Division.
  •  Laying of new additional 11 KV HT XLPE underground Cable 3x70 Sqmm. in 6.6 KV feeder No.-3 from Thana Cornelganj to Bhaisa Godam under E.H. Division.
  •  For laying of additional under ground cable from New RPH S/s to Green Park Chauraha opposite of UP Stock Exchange HTPB under work on feeder No.-139.
  •  Increasing Capacity of 33/11 KV S/S H-Block Kidwai Nagar from (8 & 10) MVA to (10 & 10) MVA under Kidwai Nagar Division, Kesco., Kanpur
  •  Laying of 33 KV XLPE Cable under Yashoda Nagar Bypass NH-2 Parallel with existing damage cable of 33 KV (Anandpuri & Baradevi) Double Circuit feeder under Kidwai Nagar Division, Kesoc., Kanpur
  •  Installation of 250 KVA 11/0.43 KV Distribution Transformer and Laying of AB Cable for Electrification of Phase-III Tatya Tope Nagar under World Bank Barra Division, Kesco., Kanpur.
  •  SUPPLY OF FURNITURE REQUIRED FOR DIRECTOR (TECH.), DIRECTOR (COMMERCIAL) & DIRECTOR (FINANCE) AT KESA HOUSE AND MODIFICATION & RENOVATION OF COMMITTEE ROOM TO COVERT CHIEF ENGINEER OFFICE AT BIJLIGHAR, KESCo, KANPUR.
  •  CONSTRUCTION OF SHED TOILET RCC BENCH AND OTHER MISC WORK FOR PRIVATE GANG AT PHOOLBAGH GOVIND NAGAR H-BLOCK KIDWAI NAGAR NAUBASTA KESHAVPURAM KESCo KANPUR
  •  For attending of Break-downs of 11 KV LT/HT lines, Replacement/Repairing of damage Poles at Aaloomandi, Electricity House & Zareebchowki Division,
  •  Digging of Kaccha & Pakka Land and use of JCB Machine in KESCo
  •  Increasing Capacity of 33/11 KV S/S Mandi Samiti (Gallamandi) & Laying of additioinal 11 KV Cables under Naubasta Division Kesco., Kanpur
  •  Increasing Capacity of 33/11 KV Pashupati Nagar, Construction of 11 KV O.H. Line for Bifurcation of oad and laying of L.T. Aerial Bunched Cable under Nuabasta Division, Kesco., Kanpur
  •  Stringing of 11 KV XLPE Cable 3x70 Sq.mm as O/H Line for energising already erected 11 KV O/H Line from West End of Bairy Akbarpur to Naramau Village due to non-clearance of route for O/H Line under Vikas Nagar Division Kesco., Kanpur and Lyaing of 11 KV HT Cable 3x70 Sq.mm XLPE on Pole as O/H Line from Switch at Switching S/S Elginmill to existing HTPB GCTI in Place of existing Jarjar PILCA Cable to avoid frequent fault of Feeder No. 2 emanating from 33/6.6 KV S/S Old RPH under Electricity House Division, Kesco., Kanpu
  •  For Supply of 11 KV St. Thu. Cable Box (XLPE 3x70 Sqmm.)-50 Nos. and 11 KV Out door Cable Box (XLPE 3x70 Sqmm.)-10 Nos. at Electricity House Division
  •  Supply of Proceline Bushing Insulator for various type of Power Transformer
  •  For laying of New 11 KV HT XLPE U/G Cable 3x70 Sqmm in place of old & Damaged PILCA Cable from Dadamiyan Feeder to Gulam Mohd. T/F Becongunj under EUDD-EH, KESCo.
  •  CONSTRUCTION OF BOUNDARY WALL AT 33-11 KV SUB STATION OF GUJAINI KESCo M&R (CIVIL WORK) OF VARIOUS SUB STATION UNDER KALYANPUR DIVISION KESCo KANPUR
  •  For Supply of 11 KV St. Thu. Cable Box XLPE 3x70 Sqmm. at Electricity House Division.
  •   Computer Operational Work under the area of EUDC III KESCo., Kanpur
  •  Installation of 63 KVA T/F at Sukhnipur Village under EUDD JM, KESCo. Kanpur
  •  Supply of 50 mm size long handle steel body locks (Navtal/Link/Freedam/Harison Make)
  •  Installation of 63 KVA T/F at Camandent PAC , Girja Nagar Road under EUDD Daheli Sujanpur, KESCo. Kanpur
  •  Installation of 63 KVA T/F at C- Block Shyam Nagar under EUDD Daheli Sujanpur, KESCo. Kanpur
  •  Installation of 63 KVA T/F at Kashiram Shahari Vikas Yojna Sajari under EUDD Daheli Sujanpur, KESCo. Kanpur
  •  For Laying of New underground cable from Rani Ghat Chauraha to Basant Tower under 11 KV Bangla P.T. Feeder at Nawabganj Division.
  •  For laying of 33 KV 3x300 Sqmm XLPE Cable at 33/11 KV Substation B.S. Park for load Balancing of 33 KV Feeder B.S. Park and 33 KV Feeder Haillet Under Nawabganj Division.
  •  Laying of New 11 KV HT XLPE under ground cable 3x300 Sqmm. in place of old and damage Pilca Cable 3x150 Sqmm. on Feeder No.-1 6.6 KV Double Circuit from R.P.H. Sub-station to Taffco Chauraha HTPB under Electricity House.
  •  Laying of 11 K.V. 3x300 Sq.mm XLPE Cable from 33/6.6 KV S/S Mall Road to existing 33 KV Section Double Pole and Renovating 33 KV line from Section Pole to Parade Chauraha (Nai Sarak Side) and constructing Interlinking O.H. Line up to 6.6 KV 110 No. Feeder Ist Pole at Nai Sarak under Bijlighar Division,Kesco., Kanpur.
  •  Making alternate arrangement to meet out eventuality of 33 KV under ground Cable fault of 33KV Aloomandi – First Feeder between Manorama Guest House to Gurudeo Crossing where 33 KV under ground Cable buried under Cycle Track by KDA under Aloomandi Division, Kesco., Kanpur
  •  Laying of 33 KV Additional Cable Parallel to Existing Single 33 KV Cable and Installation of 33 KV Bus Isolator at 33/11 KV Sub-Station Meeta Saria under Dada Nagar Division, Kesco., Kanpur
  •  (T-27) In place of damage U/G cable with HT Line Laying for jointing of 2 Nos. T/F from M-65 Beconganj Feeder to Roopam Chaurah and jointing 2 Nos. T/fs of MCS Honda & Solar Press T/fs of GIC S/s under EH Division. (T-28) Replacement of old/damaged ABC of Meena Electronics 400 KVA Kabab Paratha T/f Lal Kuwan Feeder and replacement of LT Poles at EH Division.
  •  (T-25) For supply of 11 KV St. Thu. Cable Box XLPE 3x70 Sqmm. & 11 KV O/D Cable Box. (T-26) For Replacement of old/damaged ABC at Goga T/f Lakermandi feeder, Police Chowki T/f Chunniganj and Maurang T/f under Electricity House.
  •  For the work of Replacement / Repairing Pole, damage HT/LT damage lines at Phoolbagh & Nawabganj Division during Storm & Heavy rains for maintaing of Electricity.
  •  MODIFICATION AND ALTERATION OF ROOMS IN VERANDAH TO MAKE ANOTHER ROOM AT M.D. HOUSE, KESCo, KANPUR.
  •  On the occasion of RAMJAN for the work of laying of ABC, replacement of pole, Attending/maintenance of transformers & sagging of conductor in the area of Chamnganj & Sakera Estate under Zareebchowki Division.
  •  Installation of 63 KVA T/F at Premises of Defiance Colony Tank under EUDD JM, KESCo. Kanpur
  •  Installation of 63 KVA T/F At Ganga Vihar Park under EUDD JM, KESCo. Kanpur
  •  Installation of 63 KVA T/F At KDA Park under EUDD JM, KESCo. Kanpur
  •  Auction for cutting of 27 Trees at kesa worker colony, Azad Nagar, Kanpur.
  •  FIXING OF L.E.D BULB & ENERGY EFFICIENT CEILING FAN AT KESA HOUSE, KESCo, CONSTRUCTION OF SHED ON ALREADY CONSTRUCTED STAGE, GROUND RENEWAL OF ROOM AND CIVIL STORE SITUATED IN RAMLEELA GROUND AT KWC, AZAD NAGAR, M & R WORK OF TILAK NAGAR, VISHNUPURI, KHALASI LINE, MALL VIEW AND GUEST HOUSE KESCo OFFICER COLONY, CONSTRUCTION CEMENT CONCRETE ROAD AND OTHER MISC. CIVIL WORK AT TILAK NAGAR OFFICER COLONY IN BETWEEN RESIDENCE No. 1 AND RESIDENCE No. 2 To 6 AT TILAK NAGAR AND REPAIRING & RAISING OF BOUNDARY WALL, REPAIRING OF CONTROL ROOM ROOF, REPLACING OF STORE G.C.I. SHEET, ELECTRIFICATION, SANITARY AND MISC. CIVIL WORK AT ALOOMANDI, KESCo, KANPUR
  •  (1) 20/EUDC/2016-17 Replacement of damage AB Cable of RajjanChhaki 400 KVA T/F at Mall Road S/S under EH Division (2) 21/EUDC/2016-17 Increasing Capacity of Transformer installed in feeder M-65 from 250/6.6 KVA T/F to 400/6.6 KVA at Mall Road S/S under EH Division (3) 22/EUDC/2016-17 Laying of 780 Mtr. AB Cable from Madrsa T/F to NaiSadak Under EH Division
  •  1 16/EUDC/2016-17 Laying of ABC in the area of Vaidya JiKaHata at GIC S/S Under EH Division 2 17/EUDC/2016-17 Replacement of damage AB Cable at 2x400 1x250 KVA Meston Road T/F at Mall Road S/S under EH Division 3 18/EUDC/2016-17 Replacement of damage AB Cable of 400 KVA Nizam Dhal T/F at Mall Road at Mall Road S/S under EH Division 4 19/EUDC/2016-17 Replacement of damage AB Cable at 2x400 KVA Naya Chook T/F at Mall Road S/S under EH Division
  •  Date Extension of Tender No. 05/EUDC -III/2016-17
  •  ASDJKSDJF
  •  15W CFL under bachat lap yojna
  •  Work of Laying of LT Aerial Bunch Cable with supply and erection of LT XLPE AB Cable and associated material
  •  Work of Laying of LT Aerial Bunch Cable with supply and erection of LT XLPE AB Cable and associated material
  •  Work of Laying of LT Aerial Bunch Cable with supply and erection of LT XLPE AB Cable and associated material
  •  Laying Aerial bunch cable with supply and erection of LT XLPE AB Cable and associated material
  •  supply and erection of LT XLPE AB Cable and associated material.
  •  Supply of Revenue Receipt
  •  Maintenance of Electrical System
  •  Maintenance of Electrical System
  •  Maintenance of Electrical System
  •  construciton of line
  •  printing and supply
  •   .
  •  Shifting of 11 KV/LT Lines
  •  Hiring of 1 No. diesel jeep for SDO, EDSD-II Kotdwar for approx 5 months
  •  Renovation of damaged 33KV, 11KV lines and S/S in Dugadda & Yamkeshwar block under EDD Kotdwar
  •  Purchase of Power
  •  Supply of Pre-Printed Bill Roll
  •  Revenue Receipt Book
  •  LT XLPE AB Cable
  •  Annual Maintenance of 33/11 KV S/S Barakote, Devidhura, Khetikhan, Champawat
  •  Annual Maintenance of 33/11 KV S/S Kaushani, Bageshwar
  •  Annual Maintenance of 33/11 KV S/S Kanda (Dafaut), Bageshwar
  •  Annual maintenance of 33/11 KV S/S Syaldey, Ranikhet
  •  Annual Maintenance of 33/11 KV S/S Manila, Ranikhet
  •  Annual Maintenance of 33/11 KV S/S Salt Ranikhet
  •  Annual Maintenance of 33/11 KV S/S Masi, Ranikhet
  •  Annual Maintenance of 33/11 KV S/S Bagwalipokher, Ranikhet
  •  Annual Maintenance of 33/11 KV S/S Dwarahat, Ranikhet
  •  Annual Maintenance of 33/11 KV S/S Bojal Ranikhet
  •  EDD-Almora/08/2013-14
  •  EDD-Almora/07/2013-14
  •  Repair and other civil work
  •  Photocopy work of letters/ documents etc of the office of EE, EDD, Kotdwar
  •  Providing 6 No. personnel for attending B/D during night hours at 33KV S/S Kotdwar
  •  Replacement of damaged VCB of 33KV S/S Rikhankihal
  •  EDD-Almora/06/2013-14
  •  EDD-Almora/05/2013-14
  •  ACSR Dog Conductor 1000Km
  •  ACSR Weasel Conductor 6000Km
  •  DT Meter Category ⿿A⿝ ICS ETD-13, 6211 COSEM Standard 2,100Nos
  •  (i) 11KV XLPE Cable 3x35Sq.mm 2Km (ii)11KV XLPE Cable 3x150Sq.mm 1.5Km (iii) 11KV XLPE Cable 3x400Sq.mm 1.2Km (iv)11KV XLPE Cable 1x630Sq.mm 5Km
  •  AMC support for PCs and peripherals including FMS in Urja Bhawan, UPCL
  •  LT XLPE Cable
  •  8.5 Meter Long PCC Pole 20000Nos
  •  Construction of 11KV/LT Line and Substation
  •   ​विद्युत ​वितरण मण्‍डल रानीखेत के अन्‍तर्गत ​विद्युत ​वितरण खण्‍ड, अल्‍मोड़ा/रानीखेत/​पिथौरागढ/चम्‍पावत के ३३/११ केवी उपसंस्‍थानों के ११ केवी एपोक्‍सी रे​जिन कास्‍टेड डाई टाइप उपसंस्‍थान पीटी हाउ​सिंग के साथ आपू​र्ति एवं स्‍थापना का कार्य
  •  विद्युत ​वितरण उपखण्‍ड–प्रथम, अल्‍मोड़ा के ​विद्युत ​वितरण अनुभाग–धारानौला एवं जाखनदेवी, अल्‍मोड़ा अन्‍तर्गत क्ष​तिग्रस्‍त लकड़ी/लोहे के पोल बदलने का कार्य
  •  विद्युत ​वितरण खण्‍ड, अल्‍मोड़ा के अन्‍तर्गत ३३/११ केवी उपसंस्‍थान लक्ष्‍मेश्‍वर में रा​त्रिकालीन कम्‍प्‍लेन सेन्‍टर स्‍था​पित कर यू०ई०आर०सी० के ​नियमों के तहत समय पर ब्रेकडाउन एवं भाहरी क्षे, के उपभोक्‍ताओं की ​शिकायतों का ​निस्‍तारण सम्‍बन्‍
  •  Stay wire GI 7/3.15mm (7/10SWG) 115MT
  •  GI Stay Set 16x1800mm 40,000Nos GI Stay Set 20x1800mm 2,000Nos
  •  Disc Fitting (B&S) Type Rabbit/ Weasel 30KN 50,000Nos
  •  11KV G.I. Pin with Nut 1,00,000Nos
  •  8.5Meter Long Steel Tubular Pole SP-23 6000Nos
  •  8 Meter Long Steel Tubular Pole SP-10 3,000Nos
  •  Purchase/Sale of Power through PXIL/IEX
  •  Renovation of damaged lines/sub station
  •  Supply of Indoor/Outdoor Cable Box
  •  construction of LT line
  •  Feeder from 220/132/33KV Jhajra to : 33/11KV S/s at Selaqui 10Km double circuit (Panther-Dog Conductor) 0.2Km single circuit (Dog Conductor) 33/11KV S/s at Pharmacity 11.5Km single circuit (Panther Conductor)
  •  Annual Maintenance of 33/11 KV S/S Chalthi feeder under EDD Champawat
  •  Installation of LA & Earthing under EDD Ranikhet
  •   ​विद्युत ​वितरण खण्‍ड, अल्‍मोड़ा के उपखण्‍ड–प्रथम, अल्‍मोड़ा के अन्‍तर्गत यू०ई०आर०सी० मद में ​विभिन्‍न उपभोक्‍ताओं को संयोजन ​निर्गत/११ केवी लाईन/एल०टी० लाईन एवं उपस्‍थान ​निर्माण का कार्य।
  •  Transformer Oil Fresh 100KL
  •  11Meter Long Steel Tubular Pole SP-55 4000Nos
  •  13 Meter Long Steel Tubular Pole SP-72 400Nos
  •  Work of Processing & Printing of Consumer⿿s Electricity Bills for Garhwal Zone/ Kumaon Zone
  •  Power Purchase Tender for April-June 2013
  •  Prepaid meters along with vending station
  •  Selection of transaction advisors for PPP for distribution of electricity in the entire/ select areas of Udham Singh Nagar and Haridwar districts in Uttarakhand
  •  System improvement, strengthening and augmentation of distribution system
  •  RFP for SCADA Implementation Agencies
  •  SMC Metering Cubical along with LT CTs for DT Metering
  •  G.I. Wire 5mm (6SWG) 250 MT
  •  Stay wire 7/4mm (7/8SWG) 65MT G.I. wire 3.15mm (10SWG) 41MT
  •  Supply of Pre-Printed Electric Bill Roll for SBM
  •  supply of revenue receipt
  •  Shifting of electrics poles and transformers from national highway-87 under electricity distribution division (town), Haldwani
  •  Replacement of LT Conductor by AB Cable
  •  Implementation of Integrated Automated Meter Reading System (IAMR) for 11000 nos. consumers on turnkey basis
  •  hiring of one bolaro jeep with driver (for one year) for EDSD-I, Almora
  •  Hiring of one Bolero Jeep with Driver (for one year duration)
  •  Shifting of 33 KV Khyiatari and Paryavaran line
  •  Shifting of 11 KV Dholaghat feeder line
  •  Construction of 33KV Feeders from 220/132/33 KV Sub-Station Jhajhra (Dehradun)
  •  Maintenance of 11 KV /LT Lines and consumer complained in the area 33/11 KV Sub-Station Betalghat under Electricity Distribution Division Nainital
  •  Supply of various D-centralized materials
  •  construction of line
  •  Supply of various D-centralized materials
  •  short term tender notice for replacement of damaged 5 MVA transformer
  •  Purchase of power
  •  Renovation of 33 KV line Hanumanchatti to Barkot under EDD, Uttarkashi
  •  Renovation of 33 KV line Kamd (Tehri) to Chinyalisaur under EDD, uttarkashi
  •  Taking meter reading and distribution of enerby bills in SDO, Araghar area under EDD (R), Dehradun
  •  Taking meter readings and distribution of energy bills in SDO, IT Park area under EDD(R), Dehradun
  •  Purchase of 30 MW RTC, RE Power
  •  Repair of damaged copper wound distribution transformers of rating 250KVA to 1000KVA
  •  Supply of different clamps and insulators required for District Plan Works under EDD(R), Dehradun
  •  Construction of 11KV/LT & S/S for Electrification of Vill Barmati in Kapkote section under Distt. Plan 2012-13 under EDD Bageshwar
  •  Annual Maintenance of 33/11 KV S/S Kafligair Bageshwar
  •  Annual Maintenance of 33/11 KV S/S Kapkot Bageshwar
  •  Annual Maintenance of 33/11 KV S/S Dangoli (Garur) Bageshwar
  •  Annual Maintenance of 33/11 KV S/S Vijaypur (Kanda) Bageshwar
  •  Construction of line & S/S for tubewell Ratanpur & Luthapur in Dugadda block
  •   (i) 33KV XLPE Cable 3x50Sq.mm (ii) 33KV XLPE Cable 3x120Sq.mm (iii) 33KV XLPE Cable 3x400Sq.mm
  •  Releasing of New L.T. Connection under UERC Head.
  •  Releasing of New LT connection under UERC Head
  •  9Meter Long Steel Tubular Pole SP-33 4000Nos
  •  33KV G.I. Pin with Nut 20,000Nos
  •  Release of new LT connection under UERC Head
  •  Selection of of Transaction Advisor for PPP fro distribution of electricity in the entire/select areas of Udham Singh Nagar and Haridwar districts in Uttarakhand
  •  Replacement of LT Conductor by AB Cable
  •  Replacemtn of LT Conductor by AB Cable
  •  Replacement of LT Conductor by AB Cable
  •  (i) 11KV XLPE Cable 3x50Sq.mm (ii) 11KV XLPE Cable 3x70Sq.mm (iii) 11KV XLPE Cable 3x120Sq.mm (iv) 11KV XLPE Cable 3x185Sq.mm (v) 11KV XLPE Cable 3x240Sq.mm
  •  Electronic Payment Aggregator for providing Online Electricity Bills payment facility to UPCL
  •  Supply of Revenue Receipt
  •  System Improvement,Strengthening and Augmentation of distribution system for bringing down AT&C Losses and improve quality of consumer supply of towns(LT,11kV & 33kV works) as given
  •  33KV Vaccum Circuit Breaker
  •  8 Meter Long Steel Tubular Pole SP-10
  •  8.5 Meter Long PCC Pole
  •  Hiring of Bolero with Driver
  •  Appointment of CA Firms for Audit of Receivables
  •   ​विद्युत ​वितरण उपखण्‍ड आराघर के अन्‍तर्गत लम्‍बे स्‍पानों पर अ​तिरिक्‍त पोल लगाने का कार्य
  •  Replacement of outdoor metering system by indoor metering system of BSNL, Lachiwala and MES, Raiwala and Shifting of 33 KV CT PT Combined Unit from Sub-Station Yard of 33 KV Sub-Station, Nagar Palika, Rishikesh to Road side under EDD, Rishikesh
  •  Hiring of Covered Top Diesel Jeep registered in or after 2011 under Taxi Permit (along with driver) for use of Electricity Test Lab(R), Dehradun upto 31/03/2013
  •  Hiring of Covered Hard Top Body Diesel Jeep registered in or after 2011 under Taxi Permit (along with Driver) for use of Electricity Test Div(R), Dehradun upto 31/03/2013
  •  100 MW for Nov-2012 and 100 MW for Dec-12
  •  Supply of meter boxes with four no. L.T. CTs of different ratios along with PVC wire connectors for metering in distribution transformers
  •  Supply of heat shrinkable XLPE cable termination kit
  •  Supply of different clamps and other decentralised material required for giving 2 MVA & 10 MVA load to AIIMS, Rishikesh
  •  Pre-Printed Electricity Bill Roll (Printed Both side)
  •  Supply of Multistrend LT PVC Insulated Copper wire Size 6 mm Sq.
  •  Supply of Godrej Nav-Tal/ Plaza/Harisson make Brass Pad Lock size 40 mm.
  •  Construction of 33KV line to connect 6 nos. 33/11 KV Sub-station from 132/33 KV Simli including 1 No. 33 Kv Bay at 33/11 KV S/s Gauchar
  •  ​विद्युत ​वितरण खण्‍ड, अल्‍मोडा के अन्‍तर्गत नव​निर्मित उपसंस्‍थान कनारीछीना, ​विकास खण्‍ड–भै​सियाछाना, अल्‍मोडा से ११ केवी सेराघाट फीडर, ११ केवी नौगॉव/ धौलछीना फीडर, एवं ११ केवी खेती फीडर का ​निर्माण कार्य।
  •  ACSR Rabbit Conductor
  •  Hiring of diesel operated Ambassador/ Indica car with driver for one year for Electricity Distribution Circle (R), Dehradun
  •  Replacement of Conductor, laying of 11 KV & 33 KV underground, Construciton of bay and construction of 33 & 11 KV composite line for releasing of 2 MVA & 10 MVA load to AIIMS Rishikesh
  •  Appointment of Consulting Firm
  •  Purchase of Power for Jan 13 to Mar 13
  •   ​विद्युत उपभोक्‍ता ​शिकायत एवं सेवा केन्‍द्रों हेतु डीजल जीप एवं लाईन कर्मचारी उपलब्‍ध कराना।
  •  Purchase of G.I. wire 5mm (6SWG) 250MT
  •  Giving LT S/C under EDD(C),Dehradun
  •  Replacement of damaged 5 MVA T/F at 33 KV S/S Kotdwar
  •  Hiring of Diesel Vehicle with Driver for one year in contract basis
  •  Shifting of Electricity Line work
  •  Supply and Printing of Revenue Receipts
  •  Construction of 11 KV underground/overhead cable line
  •  Construciton of 33 KV underground cable